Electrical Mechanical Remediation
Field Installation Process Testing

Radiation Portal Monitoring Systems


Assembled radiation portal monitors, including support structure, radiation sensor panel, battery, stainless electronic enclosure, and UPS.   Workscope also included miscellaneous metal fabrication, installation of communications and alarm signal, conduit, unistrut, and wiring between components.

Various Locations

Quality Level: Commercial
 
 

High-Level Waste Bogie Control Panels


Designed, fabricated, and tested standardized bogies and associated equipment for use in the Hanford High-Level Waste facility.   Provided electrification and control components, including cable reels, festoons, control panels, and proximity and limit switches.

Waste Treatment Plant

Hanford Site

Richland, WA

Quality Level:

NQA-1

 
 

Portal Monitoring Alarm Panels


Fabricated and installed temporary detector bases, installed detector panels on the bases, fiber optic control cables from the control building to the detector panels, video cameras and lights, video cables for cameras, and conducted testing. All panels met UL-508 and NFPA 70 National Electrical Code.

Various Locations

Quality Level:

NQA-1

 
 

Multiple Canister Overpack Handling Machine Crane Control Simulator


Designed, fabricated, programmed, and tested a custom simulator that simulates all control, alarm and monitoring functions, with graphics display screen and alarm annunciator. System employed an Allen Bradley SLC5/05 PLC, Ibox industrial computer, and Ronan annunciator.

Spent Nuclear Fuel Project

Hanford Site

Richland, WA

Quality Level:

NQA-1

 
 
 
 

Contact: Dena Notaras